Skip to content
Haiyun Flour Milling Systems
FMFQ(S) Double Roller Mill FMFQ(S)

Grinding · Model FMFQ(S)

FMFQ(S) Double Roller Mill

Pneumatic, hydraulic, precision — the industrial standard.

  • 60+ years manufacturing
  • 10–500 t/d capacity range
  • 100+ patents
  • Turnkey commissioning

What it does

FMFQ is what a serious flour plant grinds with. Two roll pairs per stand, pneumatic or manual engagement, hydraulic roll removal, independent feed drive. Every feature exists because at industrial scale a fifteen-minute adjustment turns into a fifteen-hour shutdown.

Technical parameters

Nominal values at standard conditions. Confirm final specification on the order drawing.

Model Roll spec (mm) Fast roll (rpm) Differential Motor power Weight Dimensions (mm)
FMFQ(S) 50×2 Φ250 × 500 550 2.5 : 1 5.5–15 kW 2,400 kg 1400 × 1410 × 1850
FMFQ(S) 60×2 Φ250 × 600 550 2 : 1 5.5–18.5 kW 2,700 kg 1500 × 1410 × 1850
FMFQ(S) 80×2 Φ250 × 800 550 1.5 : 1 7.5–22 kW 2,900 kg 1700 × 1410 × 1850
FMFQ(S) 100×2 Φ250 × 1000 550 1.25 : 1 11–22 kW 3,100 kg 1900 × 1410 × 1850

Selection guidance

The differential ratio is not interchangeable — it belongs to the passage. Break passages run 2.5:1 for a cutting action; reduction passages step down to 1.25:1 for a gentle attrition action. Ordering the wrong ratio for a position is a common and costly mistake.

Maintenance

Working pressure 0.4–0.6 MPa; air consumption 0.06–0.08 m³/h per mill. Check roll parallelism every 500 hours with a feeler gauge at both ends; a 0.05 mm taper produces a visible ash gradient across the flour stream.

Selection cross-check

Roller mills: single vs double

The roll mill is 55–65% of plant power and the machine that sets your extraction. The single/double choice drives the whole building layout.

This machine

FMFQ(S) Double Roller Mill

FMFQ(S)

Choose it when

Every plant above 20 t/d. Two independent roll pairs in one frame with separate feeds, so one machine serves two passages — which is what makes a compact multi-passage flow sheet possible.

Watch out for

Higher capital per unit and it needs proper foundation and alignment. Also grinds maize, sorghum, chilli and feed materials, so it is the flexible choice for multi-product plants.

Alternative

6F Single Roller Mill

6F

Choose it when

Plants under 20 t/d, village mills, and anywhere the flow sheet has one or two passages. Simple, cheap, easy to maintain without specialist skill.

Watch out for

One pair of rolls per machine means one passage per machine — a 4B5M flow sheet would need nine separate mills and nine feed systems.

Open 6F Single Roller Mill →

Decision rule

Under 20 t/d and two passages: single. Above that: double, without exception — the building savings alone justify it.

Answers

Frequently asked questions

Straight answers to the questions engineers and mill owners actually ask us during plant sizing. If your case is not covered, send the wheat specification and your target tonnage.

Ask an engineer →
What does the S in FMFQ(S) mean?
It denotes the pneumatic (servo-assisted) engagement variant. The base FMFQ is manual engagement; the S adds pneumatic roll engagement and disengagement with remote control.
Why does the differential ratio change per passage?
Break rolls need a fast differential to shear bran open. Reduction rolls need a small differential so the endosperm is reduced by attrition rather than being cut, which would generate excessive fine bran and heat.
How much air does a mill floor need?
At 0.06–0.08 m³/h per mill of consumption, a 20-stand floor draws roughly 1.6 m³/h at 0.6 MPa. Add 30% margin for leakage and future stands.

From the brochure

FMFQ(S) Double Roller Mill catalogue images

Photographs and parameter panels reproduced from the 2026 catalogue. Captions are the original brochure text.

FMFQ(S) roller mill, second view
Fig. 1 FMFQ(S) double roller mill FMFQ(S) 型复式磨粉机
Roller mill detail
Fig. 2 Flour milling equipment

Next step

Send your tonnage. Get a flow sheet in 12 working hours.

Send us: daily capacity target, wheat type and quality, available building dimensions, and local power supply. We reply within 12 working hours with a preliminary flow sheet, equipment list and budget range — no obligation.