Skip to content
Haiyun Flour Milling Systems
60–500 t/d Complete Flour Plant

Turnkey industrial · 60–500 t/d

60–500 t/d Complete Flour Plant

Storey-typed turnkey plants with guaranteed tonnage and power draw.

  • 60+ years manufacturing
  • 10–500 t/d capacity range
  • 100+ patents
  • Turnkey commissioning

Overview

What this plant actually is

Above 100 t/d the plant is a building, not a machine. Haiyun designs the storey-typed structure, the cleaning flow, the milling flow and the pneumatic system as one package, then commissions it to a guaranteed tonnage. Every model in this range ships with a measured power consumption figure per tonne of flour — the number that decides whether the plant is profitable.

12 standard capacities from 60 to 500 t/d

Dry cleaning: 3 screening, 2 threshing, 1 brushing, 2 destoning, 2 dampening, 2 magnetic, 1 air

Light grinding, fine separation, purifier refinement, same-quality merging

Turnkey: design, manufacture, install, train, commission

Standard models and parameters

All figures are nominal at 380 V / 50 Hz with wheat at 12.5% incoming moisture and 76% extraction. Deviations of ±8% are normal and depend on wheat hardness, roll condition and operator settings.

Model Capacity Power / consumption Weight / footprint Configuration
60 t/d 60 t/d 190 kW 70–74 kWh/t
30 × 7 × 12.5 m
—
80 t/d 80 t/d 240 kW 70–74 kWh/t
35 × 7 × 12.5 m
—
100 t/d 100 t/d 308 kW 70–74 kWh/t
35 × 7.5 × 18.5 m
—
120 t/d 120 t/d 420 kW 70–74 kWh/t
39 × 7.5 × 18.5 m
—
140 t/d 140 t/d 520 kW 68–72 kWh/t
44 × 7.5 × 18.5 m
—
150 t/d 150 t/d 540 kW 68–72 kWh/t
44 × 7.5 × 22.5 m
—
160 t/d 160 t/d 580 kW 68–72 kWh/t
50 × 7.5 × 18.5 m
—
200 t/d 200 t/d 690 kW 65–71 kWh/t
50 × 7.5 × 22.5 m
—
220 t/d 220 t/d 740 kW 65–71 kWh/t
50 × 7.5 × 22.5 m
—
300 t/d 300 t/d 920 kW 65–71 kWh/t
60 × 11 × 27.5 m
—
350 t/d 350 t/d 1,170 kW 65–70 kWh/t
60 × 11 × 27.5 m
—
500 t/d 500 t/d 1,650 kW 65–70 kWh/t
55 × 17 × 27.5 m
—

Process flow

  1. 1 Intake & weighing
  2. 2 Pre-cleaning
  3. 3 3-sift / 2-scour / 1-brush cleaning
  4. 4 2 destoners
  5. 5 2 dampening + tempering 16–24 h
  6. 6 2 magnetic separators
  7. 7 Air separation
  8. 8 Multi-pass milling
  9. 9 Purifiers
  10. 10 High square sifters
  11. 11 Packing & palletising

How to select

Note the power curve: consumption per tonne falls from 70–74 kWh at 60 t/d to 65–70 kWh at 500 t/d. On 300 t/d and 330 operating days, that gap is roughly 500,000 kWh a year — often the entire margin difference between two otherwise similar plants.

Typical applications

  • National milling groups
  • Government food security programmes
  • Export-oriented flour production
  • Port-adjacent milling for import wheat

From the brochure

60–500 t/d Complete Flour Plant

Photographs and parameter panels reproduced from the 2026 wheat milling catalogue. Dimension drawings and equipment lists are the original manufacturer figures.

6FTDP-100T line, view 1
Fig. 1 6FTDP-100T flour production line 6FTDP-100T 面粉生产线
6FTDP-100T line, view 2
Fig. 2 6FTDP-100T flour production line 6FTDP-100T 面粉生产线
6FTDP-100T line, view 3
Fig. 3 6FTDP-100T flour production line 6FTDP-100T 面粉生产线
6FTDP-100T milling flow diagram
Fig. 4 Milling process 制粉工艺流程 Milling process display
6FTDP-200T steel-frame plant
Fig. 5 6FTDP-200T flour production line, steel-frame type 6FTDP-200T 面粉生产线(钢架式)
6FTDP-200T milling flow diagram
Fig. 6 Milling process 制粉工艺流程 Milling process display
6FTDP-200T line, view 1
Fig. 7 6FTDP-200T flour production line
6FTDP-200T line, view 2
Fig. 8 6FTDP-200T flour production line 6FTDP-200T 面粉生产线
6FTDP-200T line, view 3
Fig. 9 6FTDP-200T flour production line
6FTDP-200T milling flow diagram
Fig. 10 Milling process 制粉工艺流程 Milling process display
6FTDP-300T plant, tall elevation
Fig. 11 Wheat flour production line

Answers

Frequently asked questions

Straight answers to the questions engineers and mill owners actually ask us during plant sizing. If your case is not covered, send the wheat specification and your target tonnage.

Ask an engineer →
How long does a 300 t/d plant take to build?
Typically 8–11 months from contract to first flour: 8–10 weeks for design and approval, 14–18 weeks for manufacture, 6–10 weeks for civil works in parallel, then 8–12 weeks erection and 3–4 weeks commissioning.
Can the plant handle imported wheat?
Yes. Imported wheat usually means blending 2–4 origins, so the design includes electronic proportioning scales and 4–6 tempering bins with independent water addition.
What guarantee is provided?
Contracted tonnage at contracted extraction, verified over a 72-hour continuous performance test, plus a 12-month warranty on mechanical parts and 24 months on the roll packs.

Continue

Next: 6FSZ Small Flour Mill Unit

One machine, three jobs: grind, sift, lift. — 200–450 kg/h

View 6FSZ Small Flour Mill Unit →

Next step

Send your tonnage. Get a flow sheet in 12 working hours.

Send us: daily capacity target, wheat type and quality, available building dimensions, and local power supply. We reply within 12 working hours with a preliminary flow sheet, equipment list and budget range — no obligation.